Skip to content
AION 2 Guides — Launch Prep, Classes, Codes and Systems

AION 2 Playtest Times — Full Schedule in Every Timezone

The AION 2 Launch Scale Test ran September 17-18, 2026 in two six-hour windows. Full schedule in PDT, EDT, UTC, CEST and KST, and whether another is coming.

9/22/2026 Launch Scale Test Last updated: 9/22/2026 7 min read
AION 2 Playtest Times — Full Schedule in Every Timezone

FAQ

What time did the AION 2 playtest start?
Day 1 opened at 6:00 AM PDT on September 17, 2026 (13:00 UTC, 15:00 CEST). Day 2 opened at 12:00 PM PDT on September 18, 2026 (19:00 UTC, 21:00 CEST). The two days had different start times, which caught a lot of players out.
How long was each AION 2 playtest session?
Six hours per day, twelve hours in total. Day 1 ran 6:00 AM to 12:00 PM PDT and Day 2 ran 12:00 PM to 6:00 PM PDT. The servers were closed between sessions and after Day 2.
Did the AION 2 playtest require a key or registration?
No. NCSOFT stated the test was "open to everyone — no keys, no invites, no registration list". You only needed the playtest client on Steam or the PURPLE launcher.
Was AION 2 playtest progress saved?
No. Progress carried from Day 1 into Day 2, then everything was wiped when the test closed. Nothing transferred to Advance Access or the October 5 launch.
Is there another AION 2 playtest or beta coming?
As of September 22, 2026 no second test has been announced. The only remaining pre-launch access is Advance Access on September 30, which requires a Founder's Pack and is not a test — it is the live build.
Do I need to delete the AION 2 playtest client before launch?
On Steam, yes. NCSOFT told Steam players to uninstall the Playtest app and download AION 2 separately before Advance Access opens on September 30. PURPLE launcher players were told no action was needed.
Was there server maintenance during the AION 2 playtest?
Yes. NCSOFT posted a scheduled maintenance notice for September 17 and a hot fix update on September 18, both announced only inside the playtest client rather than on the main AION 2 news feed.

The AION 2 Launch Scale Test ran across September 17 and 18, 2026 in two separate six-hour windows. It was an infrastructure test, not a demo: it opened to everyone with no keys or registration, carried progress from day one into day two, then wiped all of it. This page reproduces the official schedule and converts it into every timezone players searched for.

What time did the AION 2 playtest start?

Day 1 opened at 6:00 AM PDT on September 17, and Day 2 opened at 12:00 PM PDT on September 18. The two days did not share a start time — day two began six hours later in the day than day one. NCSOFT published the windows in PDT and CEST only.

That mismatch is the single most common source of confusion about this test. If you assumed day two followed the same clock as day one, you missed the first six hours.

What does the official schedule say?

NCSOFT’s own figures were a pre-download window, two six-hour play days and twelve hours total. They are reproduced from the Steam announcements for AppID 3393110 and the playtest app 4972320, with nothing converted yet. The pre-download window opened a full day early, which is why the client was already installed for most players when day one began.

Stage PDT (official) CEST (official)
Pre-download Sep 16, 6:00 AM → Sep 17, 6:00 AM Sep 16, 15:00 → Sep 17, 15:00
Day 1 Sep 17, 6:00 AM → 12:00 PM Sep 17, 15:00 → 21:00
Day 2 Sep 18, 12:00 PM → 6:00 PM Sep 18, 21:00 → Sep 19, 03:00

Day 1 and Day 2 ran six hours per day, twelve hours total.

What the schedule looks like in your timezone

The two windows converted from the official PDT times. Everything in this table is a conversion, not an NCSOFT publication — the source figures are the PDT column above. The two days did not share a start time, so both rows matter when you read across the zones.

Timezone Day 1 (Sep 17) Day 2 (Sep 18)
PDT (UTC−7) — official 6:00 AM – 12:00 PM 12:00 PM – 6:00 PM
EDT (UTC−4) — US East 9:00 AM – 3:00 PM 3:00 PM – 9:00 PM
UTC 13:00 – 19:00 19:00 – 01:00 (Sep 19)
BST (UTC+1) — UK 2:00 PM – 8:00 PM 8:00 PM – 2:00 AM (Sep 19)
CEST (UTC+2) — official 3:00 PM – 9:00 PM 9:00 PM – 3:00 AM (Sep 19)
MSK (UTC+3) — Moscow 4:00 PM – 10:00 PM 10:00 PM – 4:00 AM (Sep 19)
IST (UTC+5:30) — India 6:30 PM – 12:30 AM 12:30 AM – 6:30 AM (Sep 19)
CST (UTC+8) — China, Singapore 9:00 PM – 3:00 AM 3:00 AM – 9:00 AM (Sep 19)
KST / JST (UTC+9) 10:00 PM – 4:00 AM 4:00 AM – 10:00 AM (Sep 19)
AEST (UTC+10) — Sydney 11:00 PM – 5:00 AM 5:00 AM – 11:00 AM (Sep 19)
NZST (UTC+12) — Auckland 1:00 AM – 7:00 AM (Sep 18) 7:00 AM – 1:00 PM (Sep 19)

A note on “PDT to EST”

If you searched for a PDT-to-EST conversion for these windows, be careful: in September the US East Coast is on EDT (UTC−4), not EST (UTC−5). Most converters and most articles label it “EST” year-round, which shifts every result by an hour.

For the record, the literal EST figures would be 8:00 AM – 2:00 PM on day one and 2:00 PM – 8:00 PM on day two — one hour earlier than the EDT row above. The EDT numbers are the correct ones for September.

The practical rule for any future AION 2 announcement: NCSOFT publishes times in PDT, so subtract 7 to get UTC first, then shift into your own zone. Going straight from PDT to your local time is where the errors creep in.

What the test actually let you do

It was infrastructure, not a content preview. NCSOFT ran it to stress the servers before the paid Advance Access window, and the restrictions reflected that: the cash shop, player trading and Founder’s Pack items were disabled, progress was wiped at the end, and nothing carried over to launch.

Detail Status
Registration, keys, invites None — “open to everyone”
Platforms Steam and the PURPLE launcher
Level cap 37
Progress Kept from Day 1 into Day 2, wiped at the end
Carry-over to launch None
Cash shop Disabled
Player trading Disabled
Founder’s Pack items Not available

The level cap of 37 is worth noting against the October 5 global build — it is a test ceiling, not a statement about the live level cap, and NCSOFT has not published what the live cap will be.

Was there maintenance during the playtest?

Yes — two events, and both were announced only inside the playtest client. That is why maintenance searches spiked while the main AION 2 news feed stayed quiet. NCSOFT posted a scheduled maintenance notice for September 17 and a hot fix update on September 18, and neither appeared on the main feed.

Event Announced Where
New LST servers opening Sep 17, 14:13 UTC Playtest app only
Scheduled maintenance Sep 17, 19:01 UTC Playtest app only
Hot fix update Sep 18, 03:57 UTC Playtest app only

If you want a single place to watch for the next round of downtime, server announcements and status checks are tracked on the AION 2 server status and maintenance page.

For the test itself, the only preparation that carried over was the client download — the preload and download guide covers the 100 GB space requirement and the difference between the two launchers.

Is there another AION 2 test coming?

As of September 22, 2026, no second test has been announced. The latest official announcement is the “Launch Scale Test Comes to a Close” post from September 19. What follows the test is Advance Access on September 30 — the live global build, open only to Founder’s Pack owners, with progress that carries into October 5. The Advance Access guide covers who gets in.

One action item if you played on Steam

NCSOFT instructed Steam players to uninstall the Playtest app and download AION 2 separately before Advance Access opens on September 30. The playtest client is a distinct Steam app (AppID 4972320) from the retail game (AppID 3393110), so leaving it installed will not get you into Advance Access. Players who used the PURPLE launcher were told no action was needed.

Sources and verification

  • Steam announcement, “Launch Scale Test Coming Up”, August 26, 2026 (test framing, open access)
  • Steam announcement, “Pre-download Now!”, September 16, 2026 (pre-download window)
  • Steam announcement, “Day 1”, September 17, 2026 (day-one PDT/CEST window)
  • Steam announcement, “Launch Scale Test Comes to a Close”, September 19, 2026 (no further test)
  • Playtest-app announcement feed, AppID 4972320 (server opening, scheduled maintenance, hot fix)
  • Steam store page, AppID 4972320 (playtest client as a separate app; uninstall instruction)

Evidence level: Official. Every clock time, restriction and announcement date above comes from NCSOFT’s own Steam posts. The timezone table is a conversion of the official PDT and CEST windows and is labelled as such; the offset for each zone was applied from the official PDT figure, not from a third-party converter.

Related Articles

Was this helpful?